Dry Riser & Hydrant Testing,
Fully Managed Online

Add your properties, buy credits, and we handle everything else — automatic engineer assignment, digital certificates, and remedial quotes, all in one place.

Certificates issued same-day · BS9990:2015 tested · North West England

How It Works

From creating your account to receiving your compliance certificate — fully automated, nothing falls through the cracks.

Step 1
Add Your Properties

Add each building with the number of dry risers and hydrants. Enter any known test dates and we auto-calculate next due dates.

Add New Property
Building Name
Harbour Tower A
Building Type
Residential
Dry Risers
2
Hydrants
1
Step 2
Top Up Credits

Buy credits per service type. One credit covers one engineer visit to one asset. Credits are consumed automatically when an engineer is assigned.

Credit Balance
Pressure Test
£179 ex VAT per credit
3
Visual Inspection
£99 ex VAT per credit
5
Hydrant Test
£109 ex VAT per credit
2
Step 3
Auto-Engineer Assignment

Every morning we check all assets. Any due within 14 days gets an engineer assigned automatically — no action needed from you.

Engineer Assigned — Harbour Tower A
AssetRiser 1
EngineerJames M.
Date12 Jun 2025
Step 4
Engineer Attends

The engineer attends on the scheduled date. The asset status updates to In Progress while on site.

Riser 1 — In Progress
Engineer on site
Pressure test underway
Certificate pending result
Step 5
Pass — Certificate Issued

A signed digital certificate is generated instantly. Download as PDF at any time. Asset dates reset and a new renewal date is set.

Certificate of ConformityCERT-DRT-2024-0412
Outcome✓ PASS
StandardBS9990:2015
Next due12 Jun 2026
Step 6
Fail — Remedial Quote

If a test fails, the asset is marked Remedial Required and an itemised quote appears in your portal. Accept online and we book the work.

QT-2024-0089Awaiting Response
Replace inlet valve£285
Re-test£179
Total inc. VAT£621.60

Your Properties at a Glance

Every building, every riser, every hydrant tracked in one dashboard with live status indicators and automatic renewal dates.

dryrisertests.co.uk/client/properties

Properties

Manage your buildings, dry risers, hydrants and sprinkler systems

1 property has overdue assets — expand to view and request an urgent visit.
PropertyDry RisersHydrantsSprinklersNext DueStatus
Harbour Tower Block A
14 Quayside Rd, Manchester
Residential · 12 floors
2 risers 1 hydrant 1 system12 Jun 2025Due Soon
Salford Exchange House
88 Chapel Street, Salford
Commercial · 8 floors
3 risers04 Sep 2025Current
Victoria Mill Apartments
2 Mill Lane, Bolton
Residential · 6 floors
1 riser 2 hydrants 1 system15 Jan 2025Overdue
Arndale Point
55 Corporation St, Preston
Mixed Use · 5 floors
1 riser22 Apr 2025Engineer Assigned
Expand any row to view individual riser, hydrant & sprinkler details, edit test dates, or request an urgent visit.

What Every Dry Riser Inspection Covers

Every annual service begins with a thorough 14-point visual inspection followed by a 15-minute hydraulic pressure test — carried out by our trained IFEDA technicians.

1Levels covered
2Number of landing valves
3Inlet breeching valve checked
4System fully tested to 12 bar
5System fully drained after test
6System meets current standards
7Number of outlet cabinets
8Correct signage displayed
9Outlet valve caps and chains in place
10Landing valve condition satisfactory
11Drain valves operational
12Air vents checked
13Pipework and supports condition
14Defects detected — system conforms to BS 9990:2015
IFEDA Trained Technicians

All inspections are carried out to BS 9990:2015 by our fully trained and accredited engineers. A signed digital compliance certificate is issued the same day as the test.

Certificates, Instantly

Every time an asset passes, a signed compliance certificate is generated and stored in your portal. Download as PDF, share with insurers or inspectors, and track renewal dates — all in one place.

  • Digital certificates issued same day as test
  • Automatic renewal date tracking
  • Flagged amber 60 days before expiry
  • Separate tabs for passes and failed tests
  • Printable PDF with full property details
Harbour Tower Block A· Riser 1
12 Jun 2024Pressure TestDRT-2024-0412
Next test due 12 Jun 2025 — coming up soon
Pass
Salford Exchange House· Riser 1
04 Sep 2023Pressure TestDRT-2024-0291
Next test overdue — was due 04 Sep 2024
Pass
Example certificate
Certificate of Conformity
Annual Dry Riser Pressure Test
This system has been inspected and conforms to BS9990:2015.
Dry Riser Tests
CERT-DRT-2024-0412✓ PASS
Client
Harbour Tower Ltd
management@harbourtower.co.uk
Building / Location
Harbour Tower Block A
14 Quayside Road, Manchester, M1 4PL
Levels coveredG, 1–12
Number of landing valves12
Inlet breeching valve checked?Yes
System fully tested to 12 bar?Yes
System fully drained?Yes
System meets current standards?Yes
Number of cabinets12
Correct signageYes
Defects detectedSystem Conforms to BS9990:2015
Engineer
James Mitchell
Date of test: 12 Jun 2024
Next Service
Visual Inspection (6 Monthly)
Next test due: 12 Dec 2024
Authorised by
James Mitchell
DryRiser Tests Ltd — Authorised Engineer
Certificate issued
12 Jun 2024
CERT-DRT-2024-0412
DryRiser Tests Ltd
07851 893170 · dryrisertests.co.uk
Tested to BS9990:2015
QT-2024-0089Awaiting Response
Victoria Mill Apartments · DRT-2024-0398
Issued: 18 Apr 2024 · Valid until: 18 May 2024
£621.60
inc. VAT
DescriptionQtyUnitTotal
Replace inlet breeching valve — Riser 11£285.00£285.00
Re-test after remedial works (Riser 1)1£179.00£179.00
Replace outlet valve cap (x3)3£18.00£54.00
Subtotal (ex VAT)£518.00
VAT (20%)£103.60
Total inc. VAT£621.60

Transparent Remedial Quotes

When a test fails, our team raises an itemised remedial works quote directly in your portal. Review each line item, accept online, and we'll schedule the work. No phone calls, no chasing.

  • Itemised quote with individual parts & labour
  • Includes cost of re-test after remedial works
  • Accept or decline directly in the portal
  • Accepted quotes are automatically scheduled
  • Asset returns to Current once signed off
Tip: Our engineers carry common parts and can often complete minor repairs on the same visit — minimising the time your asset is out of compliance.

Asset Status Explained

Every dry riser and hydrant shows a clear status badge so you always know exactly where each asset stands.

Not Tested

No test dates recorded yet.

Current

All tests up to date, next due is 60+ days away.

Due Soon

A test is due within the next 60 days.

Overdue

A test date has passed with no completed test.

Urgent Request

Urgent visit requested — our team will be in touch.

Engineer Assigned

An engineer is booked and scheduled.

In Progress

Engineer is on site carrying out the test.

Remedial Required

Test failed — check Quotes for a remedial quote.

Remedial Booked

Quote accepted, remedial work is scheduled.

Simple Credit Pricing

One credit = one engineer visit to one asset. Credits are consumed automatically as engineers are assigned.

£179
ex VAT per credit
Dry Riser Annual Pressure Test

Annual pressure test on a dry riser (BS 9990:2015).

Every 12 months
£99
ex VAT per credit
Dry Riser Visual Inspection

Interim 14-point visual check on a dry riser, 6 months after pressure test.

Every 6 months
£109
ex VAT per credit
Fire Hydrant 12 Month Flow & Pressure Test

Annual flow and pressure test on a fire hydrant.

Every 12 months
£225
+ £70/floor ex VAT per credit
Sprinkler Maintenance

£225 pump & tank annual inspection plus £70 per floor for the flow test.

Every 12 months

Purchase credits directly in your portal via bank transfer. Create an account to get started or call 07851 893170.

Ready to Take Control of Your Compliance?

Create a free account, add your properties, and let our system handle the rest.